TankerTherm 123 Release Notes
This manual carries two labels: Software v2.1 · Manual Rev 3.
-
The software version is the PLC program this manual describes. It matches the Version line on the PLC Status screen. To check that you are reading the right manual, see Which manual matches my unit?.
-
The manual revision counts every published change to this manual, including corrections and added photos that have nothing to do with the PLC program. It is a whole number and is separate from the software version.
Download this manual as a PDF: Software v2.1, Manual Rev 3.
Software builds
The program builds covered by this manual.
| Build | Status screen shows | Date | What changed |
|---|---|---|---|
v2.1 |
|
31 March 2026 |
First release of the PLC-controlled unit. |
Revisions to this manual
Newest first. This manual is at Rev 3, published 19 November 2026.
Rev 3 — 19 November 2026
Photographs of the current unit, two corrected figures, and items from the independent review answered from the PLC program. Procedures are unchanged.
-
Product photographs added: the unit at the top of Overview, the manifold control panel on Operation Overview, and the rear hose connections on Unpacking & Setup, and the Remote Output Box beside the high-voltage input, and the open box with its terminals, on Remote Output Box. The Strobe factory wire colour is corrected to white with a red stripe.
-
Initial System Fill and Refill System — the Refill Pump Switch on current units is a rotary selector below the PLC HMI, with a new photo. Earlier units have a toggle above the HMI.
-
New PLC Data Log page — what the PLC records on its micro SD card and how to retrieve it. Answers a question from the independent review.
-
Specifications — temperature rise corrected to 13 °F per pass through the boiler at 19 GPM (it was stated per hour). The screen heater is marked deprecated.
-
Connecting Tankers — how the hoses attach to the manifold. Startup & First Heat Cycle — the air purge typically takes 20 to 30 seconds.
-
Two illustrations of a typical installation added: the supply drum hookup on Unpacking & Setup and a connected tanker on Connecting Tankers. In both, the unit is a photograph and the surroundings are computer-generated.
-
Specifications — height is 50″ on current units (earlier units are 46″). Refill rate stated as 4 GPM.
-
PLC Controls and Setpoints — the menu path to each screen, and the range the PLC accepts for the fill time limit (60–500 s) and the LCD heater delay (up to 60 s).
-
The auxiliary circulation pump is marked deprecated. It is not supported in later PLC software.
-
This manual is now one of a set, one per PLC software version. See Which manual matches my unit?.
Rev 2 — 6 October 2026 (issued as v2.1.0)
Revision based on an independent technical review of the first release (Rev 1). Procedures and specifications are unchanged except where noted below. The main changes: safety information is gathered in one place, electrical lockout is now an explicit procedure step, and several pages are reorganized so each task is easier to find.
-
New Safety page — all hazards in one place, with lockout/tagout steps and a definition of each safety-notice type. Notices throughout the manual now follow those definitions. For example, the air-purge notice is now a CAUTION (equipment damage) and the qualified-electrician notice is a WARNING.
-
Power Supply Connections — de-energize, lock out, and verify zero voltage is now step 1 of the connection procedure. The boiler-cover notice repeats the lockout requirement before anyone touches the boiler control wire.
-
New Operation Overview — a normal operating session from Start to Stop, the conditions that pause heating, and where each task is documented.
-
Connecting Tankers — supply and return sides named by their panel labels, a numbered photo of the manifold panel, ball-valve positions, steps for connecting and disconnecting several tankers, and how to read the pressure gauge.
-
Refill System Operation — reorganized into automatic refill, refill fault protection, and recovery. Documents what the Refill Pump Switch does: with the switch
OFF, the refill pump is locked out and the unit does not heat. -
Temperature Control — the setpoint offset is applied automatically 5 seconds after you stop pressing + / −. Adds the analog output conversion: 20 °F per volt.
-
PLC pages — one row per home-screen indicator, plainer F1 description, calibration notices moved ahead of the steps they apply to, step-by-step Max Pressure change, and a corrected Fill Time Limit table. The aux pump setpoint is confirmed in °F, and the aux pump runs only during a heating session.
-
Remote Output Box — the Temperature output needs a voltage-mode (0–10 V) input; use an interposing relay to switch loads from the Indicator and Strobe outputs.
-
Specifications — capacity stated as 123,000 BTU/hr. The duplicate "auto-shutdown of refill pump" protection row is merged into Fill Time Limit, which is the mechanism that protects the pump when the supply drum runs dry. The auxiliary circulation pump is listed as a special-order option.
-
Consistent names: page titles now match the sidebar (Initial System Fill, Startup & First Heat Cycle, Power Supply Connections), and the manual uses storage tank and supply drum throughout.
-
Web edition only: keyword search box in the site header.
Rev 1 — 28 April 2026 (issued as v2.0.0)
Initial web-first release, covering the PLC-controlled TankerTherm 123 — SKUs 20-TTDNH00-03 (480 V 3-phase) and 20-TTDNH00-06 (600 V 3-phase).
-
Full PLC controller coverage — overview, Expanded Status screen, calibration, controls, and output tests.
-
Both 480 V and 600 V SKUs documented in a single manual.
-
Remote Output Box wiring guide for connecting the unit to a remote scoreboard or PLC (12 V DC outputs and 0–10 V analog tank temperature).
-
Air-purge procedure with explicit lockout/tagout steps for the boiler control wire.
-
Refill protection: gear-pump dry-running tolerance documented (~20 minutes); fault-recovery flow corrected to require Reset → wait → Start.