Startup & First Heat Cycle

The first heat cycle requires a mandatory air-purge step to prevent boiler damage. Read this page completely before attempting first startup.

Air purge is mandatory for first startup

Skipping the air-purge step will cause the boiler to activate while air is still in the system, potentially damaging the boiler. This damage is not covered under warranty.

Do not press Start until the purge is complete.

The air purge is run from the PLC PURGE screen. The screen runs the circulation pump by itself and holds the boiler off, so no wiring is disconnected and the boiler cover stays on.

Repeat the air purge after every drain and refill.

PLC navigation at a glance
  • Home screen — live status: Circ / Heat / Fill / Fault indicators, system state banner, tank temperature, Reset Delay countdown when applicable.

  • F1 — on the Home screen, opens the Expanded Status screen (live readouts, no password). On any other screen, returns to the Home screen and clears the password; you must re-enter it to reach the Menu again.

  • F2 — opens the password prompt. After successful entry, the Menu appears with four sections: Status, Calibration, Output, Controls.

  • Password entry — press F2, tap the centre of the screen to bring up the on-screen number pad, enter 60525, confirm.

  • Esc / back arrow — returns to the previous screen.

  • Up / Down arrows — scroll within a list.

  • Enter (↵) — confirm a selection.

Step 1 — Open the PURGE screen

Before you start, the storage tank must be filled — see Initial System Fill — and the unit must be stopped, with the PLC banner reading OFF- Ready.

  1. On the PLC, press F2 and enter the password. The Menu appears.

  2. Select Controls. The Cooling Fan screen opens.

  3. Press the next arrow three times: LCD Screen Heat, Tank Heat, then PURGE.

On the PURGE screen Meaning

Start Circ Pump

Starts the circulation pump. The boiler stays off.

Stop Circ Pump

Stops the circulation pump.

Pump Running

Shows whether the circulation pump output is on.

Status line

The current system state. Reads Purging while the pump is running from this screen, or Refilling while the refill pump is topping up the storage tank at the same time. Use Pump Running to confirm the circulation pump is on.

Step 2 — Run the air purge

  1. Press Start Circ Pump. The circulation pump primes and pushes entrapped air up into the vented storage tank. The banner reads Purging. As the loop fills, the storage tank level drops and the refill pump may start; the banner then reads Refilling while the purge continues. Pump Running shows that the circulation pump is on.

  2. Listen at the storage tank. Wait until the churning / gurgling air noises have completely ceased — see the tip below.

  3. Press Stop Circ Pump.

How to know purging is complete

Listen for churning/gurgling air noises in the storage tank. The system is fully purged when these noises have completely ceased. Do not proceed until the tank is silent. This typically takes 20 to 30 seconds.

While the PURGE screen is displayed:

  • The Start button on the manifold panel is ignored, and the boiler cannot come on.

  • The E-Stop button and the low-water cut-off (LWCO) still act. Either one stops the pump and locks out the unit.

  • Pressing the Stop button on the manifold panel also stops the pump.

  • The pump stops when you leave the screen.

The PLC returns to the Home screen 5 minutes after the password is entered

When the password times out, the PLC leaves the PURGE screen and the pump stops. If the tank is not yet silent, open the PURGE screen again (Step 1) and press Start Circ Pump to continue.

Start Circ Pump has no effect if the unit is already enabled (a heating session is running), while the Stop button is held, or while a fault or its reset delay is active. Stop the unit or clear the fault first — see Troubleshooting.

Step 3 — Commence heating

  1. Press F1 to return to the Home screen.

  2. Press the external Start button (above the manifold). The boiler is now enabled and heating commences.

Step 4 — Monitor the first heat cycle

Heating will now commence. Expected behavior:

Reading Expected

Time to reach 190 °F

15–20 minutes (ambient-dependent)

Boiler temperature display

On the boiler’s onboard digital controller

PLC home-screen banner

Start Pressed → Enabled - Warmup → Enabled-Heating

PLC home-screen indicators

Circ solid; Heat solid; Fault clear

Manifold indicator lamp

1-second steady blink during warmup, then solid when heating

If the banner reads Enabled - Target Reached and Heat is off, the storage tank is already above the Tank Heat target. This is normal — see Temperature Control.

Adjusting target temperature

Temperature is set in two places:

  • The Tank Heat screen on the PLC sets the tank temperature at which the PLC holds the boiler off.

  • The boiler’s digital controller (the display on the boiler face) holds the temperature at the boiler outlet, and accepts an offset of up to ±10 °F.

Both are described in Temperature Control.

Two displays, two roles

The boiler digital controller (mounted in the boiler unit) shows boiler outlet temperature.

The PLC HMI (mounted on the cabinet wall) shows system-level state (Heating, Refilling, Cooldown, faults) and the tank-temperature reading, and holds the Tank Heat settings. See PLC Controller Overview.

Next steps